• Start
  • Company
    • About us
    • History
    • Eurocode 2 standards
    • Approvals and certificates
    • General contract terms
  • Products
  • Projects
  • Gallery
    • Pictures
    • Animations
  • Download
  • Contact
  • PERMANENT FORMWORKS (22)
    • ISOLATED FOOTINGS (2)
    • FOUNDATIONS AND COMBINED FOOTINGS (4)
    • FOUNDATION HOLES (2)
    • CONSTRUCTION JOINTS (11)
    • EXPANSION JOINTS (1)
    • FLOORS (1)
    • LINTELS AND TIE BEAMS (1)
  • REINFORCEMENT SYSTEM (4)
    • BENDABLE REINFORCEMENT (4)
  • HYDRO - INSULATIONS (11)
    • CONSTRUCTION JOINTS (6)
    • EXPANSION JOINTS (1)
    • MATS (4)
PERMANENT FORMWORKS - CONSTRUCTION JOINTS

Formax 2000

  • SPECIFICATION
  • INSTALLATION INSTRUCTIONS

Formax 2000 - is used for making construction joints in RC structures. Self-supported. Alternative term - Recostal 2000.

Load-bearing structure made of steel bars with diameters which depend on slab thickness.

Lenght of element: L = 2.25 m.

For slabs that are: 0.3 - 7.0 m.

”Key profile” construction joint transfers almost twice as big load than a flat profile profile.

Profil Formax 2000 meets all requirements for the ”key profile” construction joint

ARTICLE NUMBERTYPELENGTH L [m]HEIGHT H [m]TYPE OF SUPPORTTHICKNESS g [mm]
730-... Formax 2000/0.70 2.25 by order bar 0.70
731-... Formax 2000/1.00 2.25 by order bar 1.00
732-... Formax 2000/1.25 2.25 by order bar 1.25
733-... Formax 2000/... by order by order bar by order
Similar products

Formax 5000

Forbit 1000 BV

Formax 1000

General recommendations:

  • During the installation observe the compulsory security standards - wear protective gloves and work clothes with long sleeves.
  • During transport and storage, protect against mechanical damage.
  • Above 90 cm stays made with rebars are needed.
  • Up to 90 cm Formax 2000 is self-supported.

SELF-SUPPORTED H < 30 CM

Step 1

Installation of Formax 2000 to reinforcing mesh.

Step 2

Adding a wooden beam.

Step 3

Concreting - to do with a pressure on the bars.

STAYS H > 90 CM

Step 1

Installation of Formax 2000 with upper reinforcement and horizontal stiffness.

Step 2

Installation of stays or supports.

Step 3

Concreting - to do with a pressure on the bars.

  • Company
  • Products
  • Projects
  • Download
  • Contact
  • General contract terms
  • Service privacy policy

DYWIDAG Concrete Technologies

ul. Swobodna 6, Gajków

55-002 Kamieniec Wrocławski

Tel. 71 78 79 802, 71 78 79 803

Fax 71 79 81 693

Copyright © 2022 Partec System